EOLICA POLSKA – The Wind Farm Project

The wind power plant is located in the south-western part of Poland in the Lower Silesian Voivodeship. The right to dispose of the land for the purposes of constructing the power plant has been obtained on the basis of a long-term lease contract. The investment area is characterised by good wind conditions and an extensive infrastructure network.

The total power of the entire wind farm is 18 MW, which consists of 9 wind turbines with a capacity of 2 MW each.

The project has the “ready for construction” status and has key permits conditioning the implementation of the project.

Decision on building conditions has been obtained.

A valid decision on environmental conditions has been obtained.

The Director for Environmental Protection (RDOŚ) released the opinion on the lack of requirement to obtain a Decision on Environmental Conditions (DŚU) for a cable line.

A ten-year wind measurement campaign was carried out using professional 100-metre measuring masts together with measurement audit.

The agreement for connection to the distribution network with the key energy operator is at the negotiation stage.

Connection conditions have been issued for a wind power plant.

Wind turbine productivity analysis has been carried out.

Certificate of admission to the auction has been obtained.