  • LOCATION

The wind power plant complex is located in the central-western part of Poland in the Greater Poland Voivodeship. The right to dispose of the land for the purposes of constructing the power plant has been obtained on the basis of a long-term lease contract. The investment area is characterised by good wind conditions and an extensive infrastructure network.

  • INSTALLED POWER

The total power of the entire wind farm is 6.8 MW, which consists of 2 wind turbines with a capacity of 3.4 MW each.

  • PROJECT IMPLEMENTATION STATUS

The project has the “ready for construction” status and has key permits conditioning the implementation of the project.

  • DECISION ON CONSTRUCTION CONDITIONS

Decision on building conditions has been obtained.

  • ENVIRONMENTAL DECISION

A valid decision on environmental conditions has been obtained.

  • WIND POWER

A long-term wind measurement campaign was carried out.

  • CONNECTION AGREEMENT

An agreement on connection to the distribution network has been signed with a key energy operator.

  • CONNECTION TO THE ELECTRICITY GRID

Connection conditions have been issued for a wind power plant.

  • PRODUCTIVITY ANALYSIS

Wind turbine productivity analysis has been carried out.

  • ADMISSION TO AUCTION

Certificate of admission to the auction has been obtained.

  • POTENTIAL RECIPIENTS

The location of the project allows direct cooperation with several strategic partners who can become recipients of electricity produced by a wind park on the basis of long-term energy sales contracts.

FIGENE CAPITAL S.A.

  • ul. Nowogrodzka 6a lok. 35
  • 00-513 Warsaw

Office

  • District Court for the Capital City of Warsaw in Warsaw
  • 12h Commercial Division of the National Court Register
  • National Court Register 0000292586
  • KRS 0000292586
  • NIP [Tax ID No.] 778-102-88-46
  • REGON [Business ID No.] 630520677
  • Share capital of PLN 151,669,631.90

FIGENE CAPITAL S.A. 2019 All rights reserved