GREEN FORCE – The Wind Energy Project (2 MW)

The wind power plant is located in the northern part of Poland in the Warmian-Masurian Voivodeship. The right to dispose of the land for the purposes of constructing the power plant has been obtained on the basis of a long-term lease contract. The investment area is characterised by good wind conditions and an extensive infrastructure network.

The wind power plant consists of one 2 MW turbine.

The project has the “ready for construction” status and has key permits conditioning the implementation of the project.

Decision on building conditions has been obtained.

A valid decision on environmental conditions has been obtained.

A long-term wind measurement campaign was carried out.

An agreement on connection to the distribution network has been signed with a key energy operator.

Connection conditions have been issued for a wind power plant.

Wind turbine productivity analysis has been carried out.