INVEST WIND – Design of the wind power plant complex

  • LOCATION

The wind power plant complex is located in the northern part of Poland in the Warmian-Masurian Voivodeship. The right to dispose of the land for the purposes of constructing the power plant has been obtained on the basis of a long-term lease contract. The investment area is characterised by good wind conditions and an extensive infrastructure network.

  • INSTALLED POWER

The total power of the entire wind farm is 3.4 MW, which consists of 3 wind turbines.

  • PROJECT IMPLEMENTATION STATUS

The project has the “ready for construction” status and has key permits conditioning the implementation of the project.

  • DECISION ON CONSTRUCTION CONDITIONS

Decision on building conditions has been obtained.

  • ENVIRONMENTAL DECISION

A valid decision on environmental conditions has been obtained.

  • WIND POWER

A long-term wind measurement campaign was carried out.

  • CONNECTION AGREEMENT

An agreement on connection to the distribution network has been signed with a key energy operator.

  • CONNECTION TO THE ELECTRICITY GRID

Wind farm connection conditions were requested.

  • PRODUCTIVITY ANALYSIS

Wind turbine productivity analysis has been carried out.

  • POTENTIAL RECIPIENTS

The location of the project allows direct cooperation with several strategic partners who can become recipients of electricity produced by a wind park on the basis of long-term energy sales contracts.

FIGENE CAPITAL S.A.

  • ul. Nowogrodzka 6a lok. 35
  • 00-513 Warsaw

Office

  • District Court for the Capital City of Warsaw in Warsaw
  • 12h Commercial Division of the National Court Register
  • National Court Register 0000292586
  • KRS 0000292586
  • NIP [Tax ID No.] 778-102-88-46
  • REGON [Business ID No.] 630520677
  • Share capital of PLN 151,669,631.90

FIGENE CAPITAL S.A. 2019 All rights reserved